page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10 page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
< prev - next > Energy Hydro power Layout_and_construction_of_canals (Printable PDF)
Fig. 10
Lining a Canal
Tools and equipment required
- 3 and 30m measuring tapes
- Wooden frames: 2x 2slats
- Spirit level
- Cylindrical plumb bob
- Framing square
- Rope
- Mete stick or level hose
- Templates
- 2nails
- A pick
- A straight shovel
- A spade
- A 3 to 4 lb. sledge hammer
- A concrete tin
- A pasting tool
- A cement spreader
- A trowel
- An Oregon pine ruler
- 1 ½” x 3x 3.00 m
- 1 ½” x 3· x 1.50 m
Materials
- Thick sand
- Fine sand
- ½ to ¾” stones
- Cement
- No. 16 wire
- Wooden stakes
10
Fig. 11